HEXX Rod Holder Assembly Instructions
Fasteners
Step 1 – Pilot Holes
Step 1. Drill four (6mm – 1/4″) pilot holes using the base plate as a template.
Step 2 – Drill holes
Step 2. Drill four 10mm (25/64″) holes to mount the base plate.
Step 3 – Insert nuts
Step 3. Push two A nuts into the hex recess in the base plate.
Step 4 – Install base plate
Step 4. Push the backer plate into the four holes with the R facing down and bolt the base plate using the B Philips screws and C nuts.
Step 5 – Attach Rod Holder to Base
Step 5. Attach HEXX Rod Holder to the base with Thumb Wheel I
Step 6 – Complete!
Step 6. Your HEXX Rod Holder is ready to use!